NATURE BRIDGE WATER DEMAND ANALYSIS PEER REVIEW | MARIPOSA COUNTY – 2020

May 5, 2023
Posted in |

The National Environmental Science Center campus (NESC) required an alternative water source due to the loss of capacity of the well in the Chinquapin water system that was to be […]

Read More

ON-CALL CONSTRUCTION MANAGEMENT AND ARCHAEOLOGICAL MONITORING FOR DEBRIS REMOVAL | COUNTY OF CALAVERAS – 2019 – 2020

May 5, 2023
Posted in |

In mid-February 2019, portions of several roads throughout Calaveras County sustained considerable damage due to an extreme storm event. The debris flow and flooding caused damage to the asphalt, guardrails, […]

Read More

INTERIM BRIDGE AT INDIAN GULCH | COUNTY OF MARIPOSA DEPARTMENT OF PUBLIC WORKS – 2019

May 5, 2023
Posted in |

During March of 2018, a major storm event caused significant flooding and mudslides in Mariposa County. Indian Gulch bridge was completely washed away, including the piers and approaches. The farmers […]

Read More

GOVERNMENT CENTER OFFICE RENOVATION DESIGN | COUNTY OF MARIPOSA DEPARTMENT OF PUBLIC WORKS – 2018

May 5, 2023
Posted in |

The Mariposa County Government building needed additional office space to accommodate recent growth in staff. This office renovation design included preparing construction-ready AutoCAD drawings, preparing an engineer’s estimate of probable […]

Read More

UNDERGROUND FIRE SERVICE DESIGN | 2017 – CURRENT

May 5, 2023
Posted in |

We have prepared drawings for several underground fire service designs that require AutoCAD drawings including site layouts, details, thrust block calculation, design specification notes, and agency standard details. Our underground […]

Read More

LONG TERM CAPITAL IMPROVEMENT PROGRAM (CIP) DEVELOPMENT PROJECT | CITY OF VALLEJO – 2017

May 5, 2023
Posted in |

The City recognized the need to develop a CIP to help ensure the sustainability and reliability of their water system. The CIP provides the City with a guide to funding […]

Read More

Recycled Water System Expansion

July 1, 2020
Posted in

The City of Healdsburg implemented a water recycling program in 2005 that uses a portion of the treated wastewater for nearby water users. Treated wastewater is conveyed from the City’s […]

Read More

Long Term CIP Development Project

November 1, 2019
Posted in

The City recognized the need to develop a Capital Improvement Program (CIP) to help ensure the sustainability and reliability of their water system. The CIP provides the City guide to […]

Read More

On-Call Consulting Services

December 1, 2018
Posted in

The County of Calaveras (County) solicited Statements of Qualifications from consulting firms to provide on-call consulting services because a wide variety of professional services are utilized to assist in the […]

Read More

Government Building Office Renovation

October 1, 2018
Posted in

The City recognized the need to develop a Capital Improvement Program (CIP) to help ensure the sustainability and reliability of their water system. The CIP provides the City with a […]

Read More