NATURE BRIDGE WATER DEMAND ANALYSIS PEER REVIEW | MARIPOSA COUNTY – 2020

The National Environmental Science Center campus (NESC) required an alternative water source due to the loss of capacity of the well in the Chinquapin water system that was to be the source of water for the campus. Water supply alternatives that were being explored include drilling additional wells or annexation to the County of Mariposa. […]

NATURE BRIDGE WATER DEMAND ANALYSIS PEER REVIEW | MARIPOSA COUNTY – 2020 Read More »

ON-CALL CONSTRUCTION MANAGEMENT AND ARCHAEOLOGICAL MONITORING FOR DEBRIS REMOVAL | COUNTY OF CALAVERAS – 2019 – 2020

In mid-February 2019, portions of several roads throughout Calaveras County sustained considerable damage due to an extreme storm event. The debris flow and flooding caused damage to the asphalt, guardrails, shoulders, and ditches and debris accumulation throughout the project area.  Federal Emergency Management Agency’s (FEMA) Disaster Assistance Programs (FEMA) funded these debris removal projects through

ON-CALL CONSTRUCTION MANAGEMENT AND ARCHAEOLOGICAL MONITORING FOR DEBRIS REMOVAL | COUNTY OF CALAVERAS – 2019 – 2020 Read More »

INTERIM BRIDGE AT INDIAN GULCH | COUNTY OF MARIPOSA DEPARTMENT OF PUBLIC WORKS – 2019

During March of 2018, a major storm event caused significant flooding and mudslides in Mariposa County. Indian Gulch bridge was completely washed away, including the piers and approaches. The farmers in this area were not able to easily enter/leave the properties on either side of the creek. A disaster grant was obtained from CalOES (California

INTERIM BRIDGE AT INDIAN GULCH | COUNTY OF MARIPOSA DEPARTMENT OF PUBLIC WORKS – 2019 Read More »

GOVERNMENT CENTER OFFICE RENOVATION DESIGN | COUNTY OF MARIPOSA DEPARTMENT OF PUBLIC WORKS – 2018

The Mariposa County Government building needed additional office space to accommodate recent growth in staff. This office renovation design included preparing construction-ready AutoCAD drawings, preparing an engineer’s estimate of probable cost, design for office elevations, and details necessary to complete construction of the project in compliance with ADA and other local permitting requirements. We coordinated

GOVERNMENT CENTER OFFICE RENOVATION DESIGN | COUNTY OF MARIPOSA DEPARTMENT OF PUBLIC WORKS – 2018 Read More »

UNDERGROUND FIRE SERVICE DESIGN | 2017 – CURRENT

We have prepared drawings for several underground fire service designs that require AutoCAD drawings including site layouts, details, thrust block calculation, design specification notes, and agency standard details. Our underground fire designs are in compliance with the appropriate NFPA standards and local agency standards. We prepare formal responses to Fire Department comments, permit applications, and

UNDERGROUND FIRE SERVICE DESIGN | 2017 – CURRENT Read More »

LONG TERM CAPITAL IMPROVEMENT PROGRAM (CIP) DEVELOPMENT PROJECT | CITY OF VALLEJO – 2017

The City recognized the need to develop a CIP to help ensure the sustainability and reliability of their water system. The CIP provides the City with a guide to funding projects over a 30-year planning period based on a technically-sound methodology that achieves the City’s immediate and long-term objectives. A risk-based model was developed to

LONG TERM CAPITAL IMPROVEMENT PROGRAM (CIP) DEVELOPMENT PROJECT | CITY OF VALLEJO – 2017 Read More »

Recycled Water System Expansion

The City of Healdsburg implemented a water recycling program in 2005 that uses a portion of the treated wastewater for nearby water users. Treated wastewater is conveyed from the City’s Waste Water Treatment Plant (WWTP) via two pipelines that extend north and south of the WWTP and via trucks, which haul water to additional users.

Recycled Water System Expansion Read More »

Long Term CIP Development Project

The City recognized the need to develop a Capital Improvement Program (CIP) to help ensure the sustainability and reliability of their water system. The CIP provides the City guide to funding projects over a 30-year planning period that achieves the City’s immediate and long-term objectives. SCOPE OF SERVICES: Water System Configuration and Operation Data Collection,

Long Term CIP Development Project Read More »

On-Call Consulting Services

The County of Calaveras (County) solicited Statements of Qualifications from consulting firms to provide on-call consulting services because a wide variety of professional services are utilized to assist in the delivery of County projects and programs for a variety of departments. Many of the professional services identified in this Request for Qualifications (RFQ) were related

On-Call Consulting Services Read More »

Government Building Office Renovation

The City recognized the need to develop a Capital Improvement Program (CIP) to help ensure the sustainability and reliability of their water system. The CIP provides the City with a guide to funding projects over a 30-year planning period that achieves the City’s immediate and long-term objectives. SCOPE OF SERVICES: Data Collection and Review Space

Government Building Office Renovation Read More »