STAGECOACH WATER SYSTEM HYDRAULIC MODEL, STAGECOACH GENERAL IMPROVEMENT DISTRICT, SUBCONSULTANT TO NCE | 2022

Stagecoach Water General Improvement District installed piping improvements and required an updated fire flow analysis to ensure the water system improvements did not negatively impact the capacity and pressures. We provided guidance and our hydraulic modeling expertise in WaterCAD to NCE by assisting with both the required updates to the hydraulic model and the results […]

STAGECOACH WATER SYSTEM HYDRAULIC MODEL, STAGECOACH GENERAL IMPROVEMENT DISTRICT, SUBCONSULTANT TO NCE | 2022 Read More »

LEXINGTON RESERVOIR RAW WATER INTAKE FEASIBILITY STUDY | SAN JOSE WATER COMPANY – 2021 (IN PROGRESS)

Lexington Reservoir is located on Los Gatos Creek (downstream of Lake Elsman) and has an approximate capacity of 19,000 acre-feet. Lexington Reservoir is owned and operated by Santa Clara Valley Water District (Valley Water, VW) to store water, meet water supply, flood risk reduction, and to provide secondary recreational benefits. Water is captured during the

LEXINGTON RESERVOIR RAW WATER INTAKE FEASIBILITY STUDY | SAN JOSE WATER COMPANY – 2021 (IN PROGRESS) Read More »

LONG TERM CAPITAL IMPROVEMENT PROGRAM (CIP) DEVELOPMENT PROJECT | CITY OF VALLEJO – 2017

The City recognized the need to develop a CIP to help ensure the sustainability and reliability of their water system. The CIP provides the City with a guide to funding projects over a 30-year planning period based on a technically-sound methodology that achieves the City’s immediate and long-term objectives. A risk-based model was developed to