SPANE PARK STORMWATER CAPTURE PROJECT | CITY OF PARAMOUNT – 2022 (IN PROGRESS)

May 5, 2023
Posted in |

Spane Park is a city-owned park in Paramount and is a Tributary to LA River. The park is in a disadvantaged community and was identified as an optimal regional project […]

Read More

SAN PASCUAL REGIONAL PARK STORMWATER CAPTURE PROJECT | CITY OF PASADENA – 2022 (IN PROGRESS)

May 5, 2023
Posted in |

The San Rafael Creek and the Arroyo Seco channel are located just south of San Rafael Ave in Pasadena, CA. A new proposed infiltration basin will intercept some wet weather […]

Read More

STAGECOACH WATER SYSTEM HYDRAULIC MODEL, STAGECOACH GENERAL IMPROVEMENT DISTRICT, SUBCONSULTANT TO NCE | 2022

May 5, 2023
Posted in |

Stagecoach Water General Improvement District installed piping improvements and required an updated fire flow analysis to ensure the water system improvements did not negatively impact the capacity and pressures. We […]

Read More

LEXINGTON RESERVOIR RAW WATER INTAKE FEASIBILITY STUDY | SAN JOSE WATER COMPANY – 2021 (IN PROGRESS)

May 5, 2023
Posted in |

Lexington Reservoir is located on Los Gatos Creek (downstream of Lake Elsman) and has an approximate capacity of 19,000 acre-feet. Lexington Reservoir is owned and operated by Santa Clara Valley […]

Read More

Brown Street Sewer and Water Main Replacement Design | City of Healdsburg – 2022 (In progress)

May 5, 2023
Posted in |

Myriad Engineering provided design services for the replacement of sewer and water mains, laterals, and meters in the Old Town area of Healdsburg. A topographic survey was completed by our […]

Read More

TECHNICAL AND CONSTRUCTABILITY REVIEW – PFAS TREATMENT DESIGN | CITY OF PICO RIVERA – 2021

May 5, 2023
Posted in |

Based on monitoring results from August 2019, it was determined that the Notification Level for perfluorooctanoic acid (PFOA) and perfluorooctane sulfonate (PFOS) in the groundwater served to customers had been […]

Read More

FRESNO TRUCK WASH TREATMENT ALTERNATIVES ANALYSIS | FRESNO TRUCK WASH LLC – 2020

May 5, 2023
Posted in |

The Fresno Truck Wash (FTW) facility pretreats wastewater generated from washing trucks on site prior to discharging to the Malaga County Water District (the District) sewerage infrastructure. The FTW was […]

Read More

YOSEMITE WEST WWTP CAPACITY ANALYSIS | MARIPOSA COUNTY – 2020

May 5, 2023
Posted in |

The original Yosemite West WWTP facility was constructed in the 1960s to support the needs of a small residential community in the high elevation of Yosemite Valley. The facility was […]

Read More

TOWN RENOVATION – SEWER DESIGN | COUNTY OF MARIPOSA DEPARTMENT OF PUBLIC WORKS – 2020

May 5, 2023
Posted in |

Myriad Engineering provided sewer design services for a 10,000 LF sewer pipeline project in the historic downtown area of Mariposa to increase reliability for impacted businesses and residents. Based on […]

Read More

RECYCLED WATER SYSTEM EXPANSION DESIGN | CITY OF HEALDSBURG – 2020

May 5, 2023
Posted in |

Myriad Engineering provided drafting and design assistance services for approximately 10,000 LF of recycled water for crop irrigation of agriculture properties in the surrounding hillside area of Healdsburg. The project […]

Read More